Battery storage for Data Centres and Telecom Towers
Replaces DG runtime and adds peak savings.
Last updated: 17 Nov 2026
The problem and the fix
Problem: 24x7 uptime with costly diesel backup.
How BESS solves it: Replaces DG runtime and adds peak savings.
Recommended setup: Rack batteries or containers
Typical 24-hour load pattern
Share of daily use by hour. Green: grid load today. Blue: grid load with a battery shifting evening peak use.
Typical size, savings and payback
System size
10 kWh (tower) – 5 MWh
Yearly savings
₹50,000/tower – ₹1 Cr/yr
Payback
3–6 yrs
India note
Telecom tower: 15 kWh replaces 4 h/day DG.
Careful
Indicative ranges only. Your numbers depend on bills, tariff and site. A site survey is needed for final design.
FAQs
Replace UPS?
Can complement or replace UPS batteries.