BESS Academyby Saksham Solar

Battery storage for Data Centres and Telecom Towers

Replaces DG runtime and adds peak savings.

Last updated: 17 Nov 2026

The problem and the fix

Problem: 24x7 uptime with costly diesel backup.

How BESS solves it: Replaces DG runtime and adds peak savings.

Recommended setup: Rack batteries or containers

Typical 24-hour load pattern

Share of daily use by hour. Green: grid load today. Blue: grid load with a battery shifting evening peak use.

Typical size, savings and payback

System size

10 kWh (tower) – 5 MWh

Yearly savings

₹50,000/tower – ₹1 Cr/yr

Payback

3–6 yrs

India note

Telecom tower: 15 kWh replaces 4 h/day DG.

Careful

Indicative ranges only. Your numbers depend on bills, tariff and site. A site survey is needed for final design.
Size it for me

FAQs

Replace UPS?

Can complement or replace UPS batteries.

Read next