BESS Glossary
223 terms in one line each.
- AC
- Alternating current, the kind of power in your wall socket.
- ACC
- Advanced Chemistry Cell, target of the PLI scheme.
- Active balancing
- Moving energy between cells to balance them.
- Adani Electricity
- Private DISCOM serving suburban Mumbai.
- Aerosol suppression
- Fire agent sprayed as fine particles.
- AGM resolution
- Society general body decision approving a project.
- Air cooling
- Fans or AC cooling the battery.
- Ambient temperature
- Temperature of the surroundings.
- AMC
- Annual maintenance contract.
- Ampere (A)
- Unit of electric current, like the flow rate of water.
- Ampere-hour (Ah)
- Charge a battery can deliver; Ah × voltage ÷ 1000 = kWh.
- Ancillary services
- Grid support services like frequency control.
- Anode
- Negative electrode, usually graphite.
- Arc flash
- Dangerous electrical explosion during faults.
- ATS
- Automatic transfer switch between grid, DG and battery.
- Banking
- Storing exported solar units with the DISCOM for later adjustment.
- Base load
- Minimum load that runs all the time.
- Battery energy
- Stored kWh.
- Battery power
- Charge/discharge kW.
- Behind-the-meter
- Battery on the customer side of the meter.
- BESS
- Battery Energy Storage System: batteries plus the electronics and safety systems around them.
- BEST
- Brihanmumbai Electric Supply and Transport, supplying South Mumbai.
- Bharat AC/DC
- Indian EV charger standards.
- Bidirectional meter
- Meter that records both import and export.
- Billing demand
- Demand used for charges, often the higher of MD or a % of contract demand.
- Black mass
- Shredded battery material from which metals are recovered.
- BMS
- Battery Management System: monitors and protects every cell.
- Busbar
- Metal strip that connects cells or racks.
- C rate
- Charge or discharge speed relative to capacity. 0.5C = 2 hours to empty.
- Cabinet BESS
- Outdoor or indoor cabinet, usually 100–400 kWh.
- CAN bus
- Communication link used by BMS.
- Capacity utilisation factor (CUF)
- Actual output ÷ maximum possible output.
- Capex
- Upfront capital cost.
- Cathode
- Positive electrode, e.g. iron phosphate in LFP.
- CEA
- Central Electricity Authority, technical regulator.
- Cell balancing
- Keeping all cells at the same charge.
- Cell-to-pack
- Design that skips modules to save space.
- CERC
- Central Electricity Regulatory Commission.
- Changeover time
- Time to switch to backup, can be under 20 ms for BESS.
- Charge window
- Hours set for charging.
- Clean agent
- Gas-based fire suppression like FK-5-1-12.
- Clipping
- Solar energy lost when DC exceeds inverter rating.
- Co-located storage
- Battery at the same site as a solar or wind plant.
- Cold storage
- Refrigerated warehouse with high continuous load.
- Commissioning
- Testing and starting a new system.
- Common area load
- Lifts, pumps, lights and clubhouse in a society.
- Contactor
- Heavy switch that connects or disconnects the battery.
- Contract demand
- kVA you have agreed with the DISCOM (HT consumers).
- Critical load
- Equipment that must stay on: lifts, pumps, ICU, servers.
- Curtailment
- Wasting renewable energy that cannot be used or exported.
- Cut-off voltage
- Voltage where discharge stops to protect cells.
- Cybersecurity
- Protecting connected systems from hacking.
- Cycle life
- How many full charge-discharge cycles a battery lasts.
- Cylindrical cell
- Round cell like 18650 or 21700.
- Datasheet
- Spec sheet from the manufacturer.
- DC
- Direct current, the kind stored in a battery.
- DC fast charger
- High-power EV charger, 30–150 kW.
- Deflagration venting
- Panels that release explosive gases safely.
- Degradation
- Slow loss of capacity over time, typically 2–3% a year for LFP.
- Demand charge
- A monthly charge based on your highest recorded kVA.
- Demand response
- Reducing load when the grid asks.
- Depreciation
- Tax benefit for asset value loss; accelerated rates may apply.
- Derating
- Reducing power to protect equipment in heat.
- DG set
- Diesel generator set.
- Discharge window
- Hours set for discharging.
- DISCOM
- Your electricity distribution company, like MSEDCL, Tata Power, Adani or BEST.
- Discount rate
- Rate used to value future money today.
- Dispatch
- Schedule of charging and discharging.
- Diversity factor
- Ratio showing not all loads run together.
- DoD
- Depth of Discharge: how much of the battery is emptied in a cycle.
- Duration
- kWh ÷ kW; hours the battery can run at full power.
- Earthing
- Safe connection to ground.
- EHV
- Extra High Voltage, 66 kV and above.
- Electricity duty
- State tax on electricity use.
- Electrolyte
- Medium that carries ions between electrodes.
- EMI
- Equated monthly instalment on a loan.
- EMS
- Energy Management System: the brain that decides when to charge and discharge.
- Enclosure
- Cabinet or container housing the BESS.
- End of life
- When capacity falls below a set level, often 70%–80%.
- Energy density
- Wh per kg or per litre.
- EPC
- Engineering, procurement and construction contractor.
- EPR
- Extended Producer Responsibility for battery recycling.
- ESO
- Energy Storage Obligation for DISCOMs and others.
- EV charger
- Equipment to charge electric vehicles.
- Export limit
- Cap on how much solar you can send to the grid.
- FAT
- Factory acceptance test.
- FDRE
- Firm and dispatchable renewable energy tenders.
- Fire NOC
- No Objection Certificate from the fire department.
- Fire pump
- Pump for fire fighting; must have backup.
- Firmware
- Software inside the BMS or inverter.
- Fixed charge
- Monthly charge that does not depend on units used.
- Forecasting
- Predicting load and solar to plan dispatch.
- Frequency regulation
- Fast power injection to keep grid frequency stable.
- Front-of-the-meter
- Battery on the grid side, e.g. utility projects.
- Fuel adjustment charge (FAC)
- Variable charge passed on for changing fuel costs.
- Fuse
- Protective device that melts on overcurrent.
- Grade A cell
- Top-quality new cell with full traceability.
- Green energy open access
- Open access route for renewable power with a lower threshold.
- Gross metering
- All solar is exported and paid separately.
- GST
- Goods and Services Tax; rates differ for batteries and solar items.
- GWh
- Gigawatt hour, 1,000 MWh. Used for national targets.
- HT
- High Tension supply, 11 kV and above, for large consumers.
- Hybrid system
- Works with the grid and also gives backup during power cuts.
- Hydro-pneumatic pump
- Pressure pump common in societies.
- IK rating
- Impact resistance rating.
- Inertia
- Resistance of the grid to frequency changes.
- Inrush current
- Short surge when motors or lifts start.
- Insulation monitoring
- Detects leakage from DC to ground.
- Integrator
- Company that combines cells, PCS and EMS into a system.
- Internal resistance
- Opposition to current inside a cell; grows with age.
- IP rating
- Ingress Protection rating for dust and water, e.g. IP55.
- IRR
- Internal rate of return on the investment.
- Isolator
- Switch for safe maintenance isolation.
- kVA
- Apparent power, used for contract demand and demand charges on commercial bills.
- kW (kilowatt)
- Power, or how fast energy flows. Like the size of a tap.
- kWh (kilowatt hour)
- Energy, or how much is used or stored. One 'unit' on your bill.
- kWp
- Kilowatt peak, rated size of a solar plant.
- Lease
- Paying monthly to use equipment you do not own.
- LFP
- Lithium Iron Phosphate: the safest, longest-life common lithium chemistry.
- Liquid cooling
- Coolant plates that keep cells even in temperature.
- Liquidated damages
- Penalties if performance is not met.
- Lithium plating
- Metal lithium deposit from fast/cold charging; harms life.
- Load curve
- Graph of the load profile.
- Load factor
- Average load ÷ peak load.
- Load profile
- How your demand changes across 24 hours.
- Load shedding
- Planned power cuts to balance demand.
- Load shifting
- Moving usage from expensive hours to cheaper hours.
- LT
- Low Tension supply, 230/415 V, for homes and small businesses.
- Maximum demand (MD)
- Highest average demand in a billing block, usually 15 or 30 minutes.
- MCCB
- Moulded case circuit breaker.
- MERC
- Maharashtra Electricity Regulatory Commission; sets tariffs in Maharashtra.
- Microinverter
- Small inverter on each panel.
- MNRE
- Ministry of New and Renewable Energy.
- Modbus
- Common communication protocol for meters and inverters.
- MoP
- Ministry of Power.
- Motor starting
- High current at startup; size PCS for it.
- MPPT
- Maximum power point tracking in solar inverters.
- MSEDCL
- Maharashtra State Electricity Distribution Company Ltd, also called Mahavitaran.
- MWh
- Megawatt hour, 1,000 kWh. Used for big projects.
- Net billing
- Export and import valued at different rates.
- Net metering
- Billing where exported solar units are credited against units you use.
- NMC
- Nickel Manganese Cobalt: compact lithium chemistry used in many EVs.
- Nominal voltage
- Rated cell or pack voltage, 3.2 V for LFP cells.
- Non-critical load
- Loads that can be switched off in an outage.
- NPV
- Net present value of future savings.
- NTPC
- National Thermal Power Corporation, also builds BESS projects.
- O&M
- Operation and maintenance.
- OEM
- Original equipment manufacturer.
- Off-gas detection
- Sensors that catch early gas release before fire.
- Off-peak hours
- Cheaper TOD slot.
- Open access
- Buying power directly from a generator using the grid.
- Opex
- Running cost each year.
- Over-discharge
- Draining below safe voltage; damages cells.
- Overcharge
- Charging beyond safe voltage; dangerous.
- Passive balancing
- Burning excess energy in resistors to balance cells.
- PCS
- Power Conversion System, or inverter: converts DC from the battery to AC for your building.
- Peak hours
- Costliest TOD slot, usually evening in Maharashtra.
- Peak load
- Highest load in the day.
- Peak shaving
- Using the battery to cut the highest spikes in demand.
- Performance guarantee
- Promise on capacity or efficiency.
- PLI
- Production Linked Incentive, e.g. for advanced chemistry cells.
- Pouch cell
- Soft flat cell.
- Power cut
- Supply interruption from the grid.
- Power density
- W per kg.
- Prismatic cell
- Rectangular hard-case cell.
- Propagation
- Spread of failure from one cell to another.
- Rack-mounted battery
- Battery modules in a standard rack.
- Rebate
- Discount on the bill for meeting a condition.
- Recycling
- Recovering materials from old batteries.
- RESCO
- Renewable energy service company model; you pay for savings, not the system.
- Reserve SoC
- Charge kept aside for backup.
- Rooftop area
- Space available for panels, about 8–10 m² per kWp.
- Round trip efficiency
- Share of energy you get back after storing it, usually about 90%.
- Round-the-clock (RTC) power
- Renewable supply firmed by storage for 24 hours.
- RPO
- Renewable Purchase Obligation.
- Sanctioned load
- Maximum kW your DISCOM allows you to draw.
- SAT
- Site acceptance test.
- SCADA
- Supervisory control and data acquisition for monitoring.
- SECI
- Solar Energy Corporation of India, runs many storage tenders.
- SEI layer
- Thin film on the anode that grows as a battery ages.
- Self-consumption ratio
- Share of solar used on site.
- Self-discharge
- Slow loss of charge when idle.
- Self-sufficiency
- Share of your demand met by your own solar and battery.
- Separator
- Thin film that keeps electrodes apart.
- Shadow-free area
- Roof area without shade from tanks or trees.
- Simple payback
- Cost ÷ yearly savings.
- Single line diagram (SLD)
- Simple electrical drawing of the system.
- Site survey
- Visit to check space, loads and wiring.
- SoC
- State of Charge: how full the battery is right now, in %.
- Society committee
- Elected managing body of a housing society.
- Solar hours
- Daytime slot with a TOD discount in Maharashtra.
- Solar PV
- Photovoltaic panels that turn sunlight into electricity.
- Specific yield
- Units per kWp per day, about 4 to 4.5 in Maharashtra.
- Spinning reserve
- Standby capacity ready to respond.
- Standalone storage
- Battery connected to the grid on its own.
- String inverter
- Solar inverter connected to strings of panels.
- Subsidy
- Government support; mostly for rooftop solar, rarely for BESS.
- Surcharge
- Extra charge, e.g. peak-hour TOD surcharge.
- Surge protection device (SPD)
- Protects against lightning and surges.
- Tariff category
- Your customer class, e.g. LT Residential, HT Industrial.
- Tariff escalation
- Expected yearly rise in power prices.
- Tata Power
- Private DISCOM serving parts of Mumbai.
- TCO
- Total cost of ownership over life.
- Telecom tower
- Mobile tower site needing 24x7 power.
- Thermal runaway
- A chain reaction of overheating in battery cells.
- Throughput warranty
- Warranty limited by total MWh delivered.
- Time shifting
- Same as load shifting.
- TOD meter
- Meter that records units by time slot.
- TOD tariff
- Time of Day tariff: different prices for peak, normal and off-peak hours.
- Unit
- One kWh on your electricity bill.
- UPS
- Uninterruptible power supply, short battery backup for IT.
- Usable capacity
- Nominal capacity × DoD: what you can actually use.
- Venting
- Release of gas from a cell under fault.
- VFD
- Variable frequency drive; softens motor starts.
- VGF
- Viability Gap Funding: government support for large storage projects.
- Virtual power plant (VPP)
- Many small batteries controlled together.
- Volt (V)
- Electrical pressure that pushes current.
- Voltage dip
- Short drop in voltage that can trip machines.
- Wall-mounted battery
- Home battery fixed to a wall, 5–15 kWh.
- Water mist
- Fine water spray system for cooling and suppression.
- Watt-hour (Wh)
- One thousandth of a kWh.
- Wheeling charge
- Charge for using the DISCOM network to carry power.
- Zero export
- Setting that blocks any export.