BESS Academyby Saksham Solar

Case studies

Real buildings, real bills — before and after battery storage.

These are clearly marked SAMPLE case studies with typical numbers. Real projects will appear here soon.

Want yours to be next?

Housing Society · Pune

Sample: 120-flat society, Pune

50 kW / 100 kWh LFP, with 40 kWp solar

Bill before

₹1,80,000

Bill after

₹1,42,000

Payback

5.2 yrs

Lifts, pumps and common lights moved out of the evening peak; lifts stay on in power cuts.

Read full story

24-hour grid load: before vs after (illustrative)

Industrial · Pune

Sample: auto-parts factory, Chakan

200 kW / 430 kWh LFP, no solar

Bill before

₹14,50,000

Bill after

₹12,40,000

Payback

4.1 yrs

Peak shaving cut maximum demand by 150 kVA and shifted evening load.

Read full story

24-hour grid load: before vs after (illustrative)

Institutional · Nashik

Sample: 80-bed hospital, Nashik

100 kW / 215 kWh LFP, with 60 kWp solar

Bill before

₹4,20,000

Bill after

₹3,52,000

Payback

5.8 yrs

Instant backup for ICU and OT, and daily TOD savings.

Read full story

24-hour grid load: before vs after (illustrative)

Get a Free BESS Feasibility Report for Your Society or Business

Our engineers study your bills and tell you exactly what size battery makes sense, and what you will save.

CalculateWhatsApp