Housing Society · Pune
Sample: 120-flat society, Pune
50 kW / 100 kWh LFP, with 40 kWp solar
Bill before
₹1,80,000
Bill after
₹1,42,000
Payback
5.2 yrs
Lifts, pumps and common lights moved out of the evening peak; lifts stay on in power cuts.
Read full story24-hour grid load: before vs after (illustrative)