Battery storage for Factories (24x7)
Load shifting from solar hours and demand reduction.
Last updated: 17 Nov 2026
The problem and the fix
Problem: Continuous load pays the evening surcharge every day.
How BESS solves it: Load shifting from solar hours and demand reduction.
Recommended setup: Container BESS at HT
Typical 24-hour load pattern
Share of daily use by hour. Green: grid load today. Blue: grid load with a battery shifting evening peak use.
Typical size, savings and payback
System size
500 kWh–5 MWh
Yearly savings
₹20 lakh–2 Cr/yr
Payback
3–6 yrs
India note
Chakan plant: 1 MW / 2 MWh saves ~₹70 lakh/yr.
Careful
Indicative ranges only. Your numbers depend on bills, tariff and site. A site survey is needed for final design.
FAQs
Is HT connection needed?
Large systems connect at 11 kV via transformer.
Read next
Get a Free BESS Feasibility Report for Your Society or Business
Our engineers study your bills and tell you exactly what size battery makes sense, and what you will save.