The problem and the fix
Problem: Day-shift spikes drive demand charges; DG for outages.
How BESS solves it: Peak shaving and backup; charges from solar.
Recommended setup: C&I cabinets + rooftop solar
Typical 24-hour load pattern
Share of daily use by hour. Green: grid load today. Blue: grid load with a battery shifting evening peak use.
Typical size, savings and payback
System size
100–500 kWh
Yearly savings
₹5–25 lakh/yr
Payback
3–6 yrs
India note
MIDC unit: 150 kW / 300 kWh saves ~₹9 lakh/yr.
Careful
Indicative ranges only. Your numbers depend on bills, tariff and site. A site survey is needed for final design.
FAQs
Will it handle motor starts?
Yes, with correct PCS sizing.